Legacy assessment
A sound basis for deciding what to do with a system that slows you down.
- Duration
- 3 to 4 weeks
What you get
- Survey of architecture, technology currency and dependencies
- Assessment of the risks in day-to-day operation
- Comparison of the options: keep running, replace step by step, rebuild
- Written report with a recommendation and an effort range
A good fit if
- A grown system causes high maintenance cost or blocks new requirements.
- You need to justify a replacement decision internally.
- The original engineering team is no longer available.
Not a fit if
- Greenfield work with no existing system.
- Plain code reviews of individual components.
Not sure which one fits?
That is the normal case. In an initial conversation we work out which entry point suits your situation — or whether none of them does.
Get in touch